-
Engine Assembly
-
Engine Block Assembly And Accessory
-
Cylinder Head And Valve System Assembly
-
Timing Gear Train Assembly
-
Piston And Connecting Rod Assembly
-
Crankshaft Assembly
-
Flywheel Assembly
-
Fuel Supply System Assembly
-
Circuit Group Assembly
-
Oil Supply System
-
Cooling System
-
Starter Assembly
-
Generator And Belt Assembly
-
Brake Shoes
XINCHAI NB485PBG NC485BPG Diesel Engine Intake Valve Seat NA385B-03107 for Forklift with 1-2 Days Delivery

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xWeight | 0.1 Kg | Engine Type | Diesel |
---|---|---|---|
Part Type | Valve Seat | Engine Model | NB485PBG NC485BPG |
Part Number | NA385B-03107 | Delivery Time | 1 To 2 Days |
Video Inspection | Provided | Test Report | Provided |
Applicable Models | CPC(D)10, CPC(D)15 | Valve Type | Intake |
Material | Not Specified | Dimensions | Not Specified |
Compatibility | Forklifts | Manufacturer | XINCHAI |
Part Name | Intake Valve Seat | ||
Highlight | XINCHAI NB485PBG NC485BPG Intake Valve Seat,NA385B-03107 Diesel Engine Valve Seat,1-2 Days Delivery Engine Valve Seat |
Category | Diesel engine parts | Seat, intake valve |
---|---|
Application | Forklifts |
Part Number | NA385B-03107 |
Origin | Original manufacturer |
Delivery Time | 1 to 2 days |



Guangzhou Changli Engineering Machinery Parts Co., Ltd is a professional engine parts wholesaler dedicated to the development of engineering machinery. Founded in 2010, we have become the central warehouse for "Xinchai", "Weifang Huadong", and "Huafeng" engine parts.
- Zhejiang Xinchai
- Anhui Quanchai
- Weifang/Weichai
- YTO Dongfanghong
- Isuzu/JMC
- New Holland Shanghai
- Jiangdong JD diesel engine
- Dalian Deutz
- Yuchai
- DCD Chaoyang
- YUNNEI POWER
- FAW Wuxi



- Forklift parts
- Tractor parts
- Excavator parts
- Generator set components
- Harvester parts
- Complete engine assemblies
- Wheel loader engines and parts


Fast Turnaround: Most jobs are completed within 1-2 days. For parts not in stock, we provide a quote and estimated completion time.


- Experienced and professional staff available
- All kinds of engineering machinery engine original parts
- Sample orders available
- 24-hour response to inquiries
- Order tracking until delivery
- Post-delivery support and problem resolution
A: Generally, we pack our goods in neutral boxes or wooden cartons.
A: We are specialized in the wholesale of engineering machinery parts.
A: EXW, FOB, CFR, CIF.
A: Generally, 1-4 days for in-stock items, 7-15 days if not in stock.
Attn: David Wei
Mobile: +86 18664757023
Tel: +86-20-62648744
Wechat: 18664757023
Email: changli@liacce.com